Thursday, 26 March 2015

Discussion - Berfin Tunc


On the 26th of March, we had another discussion which we discussed about the following plans; risk assessment, permits, camera and lighting test, and finally the production schedule. At this stage of our pre-production, we are most done with it and all we need to done it the risk assessment, permits, camera and lighting test, and the production schedule. For an example, we decided at the risk assessment and the permits should we done by Dimitar, because he knows London more than me and Ali, and he felt more comfortable doing it. For Ali, I’ve decide that he should do the costume, make up and the props list, because he only did the location and the equipment’s checks and this will allow him to have a more insight look into the creative side of the production. In the pre-production, I’ve designed the storyboard, contingency plan, the budget, the brief, personnel required, and the roles so I think the production schedule would be more suitable for me to design, because I know more about the plan and what needs to done when.

No comments:

Post a Comment